2 230 m²
grain storage floor area
|
3 650 m²
concrete paving
|
420 million HUF
investment value
|
|
1 pcs
firefighting water tank
|
1 pcs
stormwater drainage system
|
Grant-funded
|
Starting point
At Sudár Agro Kft.’s site in Mezőcsokonya, storage capacity fell short at harvest time, so the farm planned to build a new grain storage hall with grant funding. Besides the store itself, on-site traffic, fire protection and stormwater drainage also had to be provided for.
| Client | Sudár Agro Kft. |
| Location | Mezőcsokonya, Somogy County |
| Category | Agriculture |
| Year of handover | 2023 |
| Financing | Funded by tender |
|
Our services
|
|
Challenges
The project involved several tasks that had to be coordinated and completed by the agreed deadline:
- construction of a 2 230 m² grain storage hall;
- 3 650 m² of heavy-duty concrete paving on transport routes and turning areas;
- a firefighting water tank in line with fire safety regulations;
- stormwater drainage to protect the site.
We were also tasked with optimising the permit drawings to reduce construction costs. In addition, the documentation required for the grant settlement had to be kept in order while construction was still under way.
Solution
We managed the entire construction of the site as general contractor. We were not involved in the preparation phase, but we optimised the permit drawings we received, which reduced construction costs.
The concrete paving and structural work were carried out with our own machinery and our own specialists, so we kept the schedule under control throughout. We also handled the grant settlement from start to finish. From the first meeting to the occupancy permit, the client had a single responsible partner.
Project images
Open gallery
Results and impact
The project was completed in 7 months, by the agreed deadline. The farm gained new storage capacity, together with the associated concrete paving, firefighting water tank and stormwater drainage.
The grant settlement was successfully closed and the farmer received the grant funding.
|
2 230 m²
grain storage floor area
|
420 million HUF
investment value
|
7 months
construction time
|
|
Handed over on schedule
|
Grant claim settled
|
Years later:
We handed the site over in 2023, and it has been in continuous operation ever since.
Thinking about a similar investment?
Get in touch with us and we will help you realize your ideas – from foundation to completion, all in one hand on solid ground. The consultation is without obligation.