For Agricultural Businesses
Back to our solutions For Agricultural Businesses

Building a Grain Storage Facility or Dryer?

We Handle the Entire Process.

We have been building in Somogy, Baranya, Tolna and Zala counties since 1992. We help with technical decisions and organise and coordinate the construction, so that alongside the building work you can also focus on running your farm.

It is not your job to coordinate

Agricultural investment made simpler
– general construction from one source

The farm keeps running during construction. Besides daily tasks, you also have to coordinate with designers, authorities and contractors, and grant-funded investments come with further rules and deadlines. We coordinate the work and liaise with everyone involved, so you still have time to run your farm. Why organise the construction alone when you can leave it to us?

What we do

Agricultural construction

From grain stores to complete site infrastructure, we keep everything in one hand, as general contractor or main contractor. We build halls and concrete pavements from 300 m².

  • Design or design coordination
    We work together with your existing designer. If you do not have one yet, we bring in a reliable specialist.
  • Permits and authority procedures
    We obtain the necessary permits and handle the consultations with the authorities.
  • Construction
    We work at a predictable pace with our own specialists and proven subcontractors.
  • Handover and settlement
    We handle the occupancy permit and the documents needed for handover. For grant-funded projects, we also take care of the settlement.
Agricultural construction
Services

Our most common services For Agricultural Businesses

With us, promises are backed by delivery.
Why choose us

With us, promises are backed by delivery.

Four things that set us apart.

  • One partner who takes it through
    Designer, authorities, grant writers, contractors – we coordinate all these. You have one responsible partner from first consultation to handover.
  • 30+ years in the same field
    We operate in Somogy, Baranya, Tolna and Zala counties. We have experience with local permitting, grant systems and site conditions, making execution smoother and more predictable.
  • Our own team, not outsiders
    More than 40 employees perform key tasks. Where subcontractors are involved, we select, coordinate and take responsibility. Scheduling is in our hands.
  • We handle it even with grants
    From preparation to final grant reporting, we manage everything in one hand – a level of coordination that is rare in construction.
Our references

Our previous works

Do you have a plan or just an idea? Let’s talk about it!

Do you have a plan or just an idea? Let’s talk about it!

Every project starts with a consultation. Without obligation, by phone or in person, whichever is more convenient for you.

Or call us: +36 82 577 440
Frequently asked questions

Learn how we work

We take on hall construction, concrete yards and industrial floors from 300 m² upwards. On a smaller stand-alone job, the cost of bringing in the machines and the crew is spread over fewer square metres, so the price per square metre is higher.

Below 300 m² we decide based on the technical content of the whole investment. We will build a pre-storage bin for a drying plant with a smaller footprint, for example.

Besides Somogy, we regularly work in Baranya, Tolna and Zala counties. In other regions we take on construction work after individual discussion.

If you already have plans, we build from them. If not, we also organise the design and permitting. If you entrust us with the complete design, the designer initiates the occupancy permit procedure.

Yes. Most of the construction is done by our own specialists, who have worked together for many years. For special work we bring in trusted subcontractors, and we coordinate the entire construction.

Yes. A large share of the grain stores and drying plants we build are grant-funded. We provide the grant writer with the contractor documents needed for the application and the settlement. You will find more details on the For grant-funded investors page.

Nothing during construction. We organise the building work and the subcontractors. We discuss the details with you during the design stage, and the designer records them precisely in the drawings. During construction we keep in constant touch on site with you or your site supervisor.

Yes, we strongly recommend a site visit. At a time agreed in advance, we show you a site similar to the one you are planning. You can look at the construction details up close and see what condition the buildings are in after 3, 5 or even 10 years of use.

Yes, if the work area can be separated off and the routes needed for delivering the crop remain usable. We take the harvest dates and the site traffic into account when scheduling the construction.

Yes, if the extension is taken into account when planning the first phase. The position of the buildings determines in which direction the site can grow later. So the designer can leave room for the next building or technology from the start and plan the utility connections and site roads accordingly.